MENU

SHARE

FOLLOW US :

Starclassic Walnut/Birch Drum Kits

DRUM KITS DRUM KITS

The evolution of Starclassic from maple, birch, bubinga, birch/bubinga continues, and now - after intense analysis, rigorous research, development and product testing - we have arrived at the latest Starclassic modern development, Starclassic Walnut/Birch.
We discovered the perfect ratio of walnut to birch that produced a superior quality of low-to-mid frequency warmth that perfectly complemented the clear attack and higher frequency projection of birch. The sound is familiar, but distinctively different from Tama sounds of the past.
The Starclassic series continues to be a representation of our collective drum-making passion, wisdom and pursuit to offer refined and differentiated sounds. Starclassic Walnut/Birch defines our commitment to evolve our drum sounds and inspire the contemporary drummer.

  • SHARE:

VIDEOS

FINISHES

LACQUER FINISHES

EXOTIC FINISHES (LACQUER)

PREMIUM LACQUER FINISHES

DURACOVER WRAP FINISHES

UNICOLOR WRAP FINISHES

COCKTAIL-JAM KIT

COCKTAIL-JAM MINI KIT

COVERING FINISHES

OIL FINISH

※該当仕上げなし※

  • LACQUER FINISHES
  • LACQUER FINISHES
  • LACQUER FINISHES
  • LACQUER FINISHES
  • LACQUER FINISHES
  • LACQUER FINISHES
  • LACQUER FINISHES
  • LACQUER FINISHES
  • DURACOVER WRAP FINISHES
  • DURACOVER WRAP FINISHES
  • DURACOVER WRAP FINISHES
  • DURACOVER WRAP FINISHES
  • DURACOVER WRAP FINISHES
  • LOR
  • MBR
  • PBK
  • ROY
  • IBP
  • CCO
  • VMP
  • LPO Lacquer Phantasm Oyster
  • LLO Lacquer Arctic Blue Oyster
  • SGF Satin Burgundy Fade
  • SPF Satin Sapphire Fade
  • TMF Transparent Mocha Fade
  • LOR Lacquer Ocean Blue Ripple
  • MBR Molten Brown Burst
  • PBK Piano Black
  • JDL Jade Silk
  • ROY Red Oyster
  • IBP Ice Blue Pearl
  • CCO Charcoal Onyx
  • VMP Vintage Marine Pearl
  • BASIC KIT

    • WBS32RZS (Lacquer Finishes)
      WBR32RZS (Duracover Wrap Finishes)

      Description Q'ty
      14"x22" Bass Drum 1
      8"x12" Tom Tom 1
      16"x16" Floor Tom 1
      MC69 Single Tom Attachment 1
    • WBS42S (Lacquer Finishes)
      WBR42S (Duracover Wrap Finishes)

      Description Q'ty
      16"x22" Bass Drum 1
      8"x10" Tom Tom 1
      9"x12" Tom Tom 1
      14"x16" Floor Tom 1
      MTH1000 Double Tom Holder 1
    • WBS52LS (Lacquer Finishes)
      WBR52LS (Duracover Wrap Finishes)

      Description Q'ty
      16"x22" Bass Drum 1
      8"x10" Tom Tom 1
      9"x12" Tom Tom 1
      12"x14" Floor Tom 1
      14"x16" Floor Tom 1
      MTH1000 Double Tom Holder 1

YOUR RECENTLY VIEWED PRODUCTS