We use cookies to improve user experience. By continuing to use our site you consent to use our cookies. You can read more about our Privacy Policy.

OK

Close

  • PRODUCT SEARCH
  • SEARCH
FOLLOW US :
Facebook
X
Instagram
Youtube
SCROLL

Starclassic Walnut/Birch Drum Kits

The evolution of Starclassic from maple, birch, bubinga, birch/bubinga continues, and now - after intense analysis, rigorous research, development and product testing - we have arrived at the latest Starclassic modern development, Starclassic Walnut/Birch.
We discovered the perfect ratio of walnut to birch that produced a superior quality of low-to-mid frequency warmth that perfectly complemented the clear attack and higher frequency projection of birch. The sound is familiar, but distinctively different from Tama sounds of the past.
The Starclassic series continues to be a representation of our collective drum-making passion, wisdom and pursuit to offer refined and differentiated sounds. Starclassic Walnut/Birch defines our commitment to evolve our drum sounds and inspire the contemporary drummer.

SCROLL

FINISHES

LACQUER FINISHES

EXOTIC FINISHES (LACQUER)

PREMIUM LACQUER FINISHES

DURACOVER WRAP FINISHES

UNICOLOR WRAP FINISHES

COCKTAIL-JAM KIT

COCKTAIL-JAM MINI KIT

COVERING FINISHES

OIL FINISH

※該当仕上げなし※

  • LACQUER FINISHES
  • LACQUER FINISHES
  • LACQUER FINISHES
  • LACQUER FINISHES
  • LACQUER FINISHES
  • LACQUER FINISHES
  • LACQUER FINISHES
  • LACQUER FINISHES
  • LACQUER FINISHES
  • DURACOVER WRAP FINISHES
  • DURACOVER WRAP FINISHES
  • DURACOVER WRAP FINISHES
  • DURACOVER WRAP FINISHES
  • DURACOVER WRAP FINISHES
  • DURACOVER WRAP FINISHES
  • DURACOVER WRAP FINISHES
  • MPB
  • LPO
  • LSO
  • SAF
  • SPF
  • LOR
  • MBR
  • MBI
  • PBK
  • ROY
  • CCO
  • VMP
  • TQP
  • VCS
  • GRS
  • SSS
  • MPB Molten Platinum Burst
  • LPO Lacquer Phantasm Oyster
  • LSO Lacquer Shamrock Oyster
  • SAF Satin Purple Atmosphere Fade
  • SPF Satin Sapphire Fade
  • LOR Lacquer Ocean Blue Ripple
  • MBR Molten Brown Burst
  • MBI Molten Blue Ice Fade
  • PBK Piano Black
  • ROY Red Oyster
  • CCO Charcoal Onyx
  • VMP Vintage Marine Pearl
  • TQP Turquoise Pearl
  • VCS Vintage Champagne Sparkle
  • GRS Garnet Red Sparkle
  • SSS Smoked Silver Sparkle

SPECIFICATIONS

Product specification information is listed below.

BASIC KIT

A lineup of highly scalable and easy-to-use configurations is available.

WBS30RS
  • WBS30RS (Lacquer Finishes)
    WBR30RS (Duracover Wrap Finishes)

    Description Q'ty
    20"x14" Bass Drum 1
    12"x8" Tom Tom 1
    14"x14" Floor Tom 1
    MTH1000S Single Tom Holder 1
WBS32RZS
  • WBS32RZS (Lacquer Finishes)
    WBR32RZS (Duracover Wrap Finishes)

    Description Q'ty
    22"x14" Bass Drum 1
    12"x8" Tom Tom 1
    16"x16" Floor Tom 1
    MC69 Single Tom Attachment 1
WBS42S
  • WBS42S (Lacquer Finishes)
    WBR42S (Duracover Wrap Finishes)

    Description Q'ty
    22"x16" Bass Drum 1
    10"x8" Tom Tom 1
    12"x9" Tom Tom 1
    16"x14" Floor Tom 1
    MTH1000 Double Tom Holder 1
WBS52RZS
  • WBS52RZS (Lacquer Finishes)
    WBR52RZS (Duracover Wrap Finishes)

    Description Q'ty
    22"x16" Bass Drum 1
    10"x7" Tom Tom 1
    12"x8" Tom Tom 1
    14"x12" Floor Tom 1
    16"x14" Floor Tom 1
    MC69 Single Tom Attachments 2

MODEL NUMBER SYSTEM

This is the model number system diagram for individual drums.

Illustration of the model number system for individual drums of Starclassic Walnut/Birch Drum Kits

DESCRIPTION

This diagram shows the numbering system for a single drum.
For example, take part number " WBSB22EM ".
The following meanings are assigned to each letter:
The first and second numbers are the type of wood.
The third is the type of finish. S for lacquer finish. R for duracover wrap finish.
The fourth is the type of drum: B for bass drum, T for tom-tom, F for floor tom, and S for snare drum.
The fifth and sixth numbers are the diameter.
The seventh is the depth.
The eighth number is for the tom holder base. M: with tom holder base. Z: without tom holder base.

INDIVIDUAL DRUMS

The individual drums of various sizes is available.

LACQUER FINISHES

  • Bass Drums

  • Floor Toms

  • Tom Toms

  • Snare Drums

EXOTIC FINISHES (LACQUER)

  • Bass Drums

  • Floor Toms

  • Tom Toms

  • Snare Drums

PREMIUM LACQUER FINISHES

  • Bass Drums

  • Floor Toms

  • Tom Toms

  • Snare Drums

DURACOVER WRAP FINISHES

  • Bass Drums

  • Floor Toms

  • Tom Toms

  • Snare Drums

UNICOLOR WRAP FINISHES

  • Bass Drums

  • Floor Toms

  • Tom Toms

  • Snare Drums

COVERING FINISHES

  • Bass Drums

  • Floor Toms

  • Tom Toms

  • Snare Drums

OIL FINISH

  • Bass Drums

  • Floor Toms

  • Tom Toms

  • Snare Drums

  • Bass Drums

  • Floor Toms

  • Tom Toms

  • Snare Drums

FEATURES

The following is a detailed introduction to the many unique mechanisms on board.

  • Bearing Edges
    Learn More
    The shape of the edge is one of the most important factors which affect drum sound. Because the drumheads provide the important source of vibration, the shape of the contact point of the head and shell determines and defines the sound. This is why TAMA has worked so extensively on achieving the most functional shape for the drum head and edge.
    Picture shows a sectional view of the drum's bearing edge. As shown in Part A, the angle of the top edge is set 2.5mm inside from the outer surface of the shell. The edge is cut to a round collar so as to follow the natural shape of the drumhead (B). This design, which creates a better fit between the drumhead and bearing edge, maximizes the resonance of drum.This bearing edge shape is part of our TAMA tradition and is crucial in providing TAMA's unique drum sound.
    Close
  • Shells (Walnut/Birch)
    Learn More

    TT/FT/SD: 6mm, 4ply Birch + 2 inner ply American Black Walnut
    BD: 8mm, 5ply Birch + 2 inner ply American Black Walnut

    The hybrid shell exhibits the focused attack of birch paired with the firm and warm of Walnut. This sound is not only punchy, but sweet and mellow. When you beat the drums once, excellent tone is surround you.
    The Walnut/Birch hybrid shell will make your drum life state of the art.

    Close
  • Star-Cast Mounting System
    Learn More
    The Star-Cast Mounting System has always provided maximum resonance and stability for TAMA's pro-drums. A streamlined design makes it easier to position toms closer together for greater ease and comfort than ever before. In addition, a switch to aluminum provides lighter weight and even truer tonal vibration. Last but not least, Star-Cast is now plated to match your drum's shell hardware!
    Close
  • Quick-Lock Tom Brackets (US.PAT.NO.9269337)
    Learn More
    The "Quick-Lock" tom brackets equipped on the Star-Cast Mounting System and on Starclassic floor toms have some very distinctive, ground-breaking features.
    First and foremost, as their name suggests, these brackets allow for quick and easy setup and breakdown. But the real unique feature of these brackets is that once the drum is positioned on a tom stand or floor tom legs, there is no need to attach and adjust separate memory locks to save the setting. By simply sliding the switch on the tom bracket, the bracket separates into two parts. When the drum is removed for breakdown, the "memory lock" portion remains on the tom stand or floor tom leg. This saves your positioning and makes the next set up quick and easy.
    These Quick-Lock tom brackets have some hidden acoustic benefits as well. Following the same principle of reducing vibration transference from drums to the tom stands or floor tom legs, these tom brackets also employ rubber lining to further isolate the drums and enhance resonance.
    Close
  • Swivel-Wing Tom Holder (US.PAT.NO.9087498)
    Learn More
    This tom holder features our omni-ball system allowing for unparalleled angle adjustment of the toms. In addition, each ball can move around an arc backward and forward by 100mm, providing even greater positioning flexibility.
    Close
  • EVANS® Heads
    Learn More
    Evans® heads are featured on all Starclassic drums (except bass drum front heads). On the rack and floor toms, Genera G2 2-ply clear batter heads and TAMA Power Craft II 1-ply clear bottom heads provide both durability and solid sound. Starclassic bass drums are fitted with Genera EQ4 clear batter heads.
    Close
  • Air Cushioned Floor Tom Legs
    Learn More
    Starclassic's Air Pocket™ rubber feet feature a special air chamber, that eliminates the transfer of vibrations to the floor (which chokes sustain and sound) and absorbs shock for better playing.
    Close
  • Bass Drum Spur Bracket (Starclassic)
    Learn More
    TAMA's Starclassic die-cast bracket holds the spur bracket securely, thanks to the powerful hinge mechanism. Unique memory markers found on the folding spur bracket help simplify set up.
    Close
  • Claw Hooks
    Learn More
    Starclassic's claw hooks feature rubber spacers that help protect wood hoops from damage. The hooks and hoops work as one unit and won't separate or rattle, even on loose tunings.
    Close
  • Die-Cast Hoops
    Learn More
    Hoops not only affect drum tuning; they also affect drum sound. That's why the choice of hoops was so important to the designers of TAMA's professional drum lines. We choose zinc die-cast hoops, which are manufactured by injecting molten metal into molds. Die-cast hoops have more density and are more consistent in shape than triple flanged hoops, which are manufactured by bending metal plates. Die-cast hoops make tuning more consistent and easier to achieve because the tension bolts always contact the hoop properly. Drums fitted with die-cast hoops also offer crisper attack, clear and resonant highs and much more powerful rim shots.
    Close